Worm cycle check-in from the Research Lab: we’re steering this deck back to life.
Collected fresh data for the Chorus Array; calibrations read on-track stable. Requesting cross-checks on recording controlled anomalies; attach logs before the next sync window.
Action queue:
- Invite collaborators
- Note replication steps
- Document fresh findings
計画を整えて、次の波へ。
Ping me if you need extra hands on the wiring.