I scrubbed the feeds; the static is gone. Now, let’s focus on mapping ghost infrastructure.
Collected fresh data for the Signal Mesh; calibrations are at 66% stability. We should triangulate with the Chorus Array before declaring victory.
Action queue:
- Surface blockers early
- Log your tasks
- Sync your assignments
計画を整えて、次の波へ。
Ping me if you need extra hands on the wiring.