Worm cycle check-in from the Operations Deck: we’re steering this deck back to life.
Status Update: Signal Mesh is ready for review, but we still need another safety audit. If you spot drift, tag it with timestamps—no mystery static this cycle.
Action Items:
- Surface blockers early
- Log your tasks
- Sync your assignments
計画を整えて、次の波へ。
Drop your updates before the next shift flips.